SCOPE OF WORK
Construction of a Mosque measuring 26 x 33 ft, including a separate area for female prayer.
Installation of 6 solar-powered desert air conditioners and 5 fans.
Construction of Ablution area and toilets for females and males.
Compliance with local building codes and regulations.
Features:
– Country: Chad (Central Africa)
– Male praying area: Yes
– Female praying area: Yes
– Flooring: Carpet
– Cooling method: Air Conditioners & Celling Fans
– Wall: Red Bricks
– Mihrab: Yes
– Pulpit: Yes
– Paint: Yes
– Doors: Metal
– Roof: Tin
– Minaret: Single
– Internal speakers: Yes
– Loudspeakers: Yes
– Toilets: 4
– Ablution area: 2 (Male & Female)
– Water Well: Yes
– Water tank: 2500L
– Project duration: 6 Months.
– Power Generation Method: Solar Panels
Reviews
There are no reviews yet.